SAPCO成本对象控制:按生产订单控制(MTO)实战指南Guide案例

上传者:叶子黄了 |  格式:doc  |  页数:85 |  大小:4710KB

文档介绍
型的2种能力类别:机器与人工工时【与后续定义的作业类型相对应】Р定义能力计划员Р定义公式参数标准值:工序РT-Code: OP7B/OPCRРFormula parameters are used in formulas for capacity planning, scheduling, costing, PRT management and determining standard values using CAPP.РA formula parameter is identifeied by a parameter ID. Every formula parameter is linked with a particualr field either in Customizing, the routing or the work center. When the formula is evaluated the parameter takes the value of the field.РActionsР1. Define your formula parameters.Р常用的工序参数类型3种:SAP_01,SAP_02,SAP_03。Р以SAP_01为例Р设置公式定义:工序РT-Code:OPCSРIn this menu option, you define formulas which are used for calculations in the following areas:Рcapacity planningРschedulingРcostingРActionsР1. Check the available formula parameters.Р2. Define the formulas needed in pany.Р与工序参数对应的3种公式