the station in normal use phase structure of working conditions is internal force calculation.In the ANSYS modeling process use beam element to simulate the main structure and use spring element simulation foundation. According to the output of calculation of internal force, try to determine the drawing and dangerous section. According to the concrete structure design specification, Take eccentric ponent model of main body structure reinforcement calculation.Р5. According to the engineering geological conditions, hydrogeological condition and the surrounding environment, and other factors, the station construction scheme design. The Ming WaFa construction, palisade structure take continuous wall practice.РKey words: Subway station;Structure design;Finite element analysis;Construction plan