全文预览

2万吨级多晶硅冷氢化反应器制造

上传者:hnxzy51 |  格式:pdf  |  页数:7 |  大小:0KB

文档介绍
fits Р Application Overview [M].Salem, VA 24153-6492 USA: Р 6 结束语 GE Energy, Revised 051109 GEI-100538A.Р 燃气轮机机组结构复杂,启动时牵涉到多个[3] GE Energy. Mark VI Control System Guide Volume I Р [M].Salem, VA 24153-6492 USA: GE Energy, Revised: Р系统,因此在进行故障分析时要结合多个系统综Р 080130 GEH-6421L.Р合分析。还要注意报警记录的完整性,对于报警Р Analysis and Treatment of Starting Failures for MS5002C Gas TurbineР Zhao Liang, Zhang Bin (China Blue Chemical Co., Ltd., Dongfang 572600)Р Abstract: This paper describes the typical starting failures of MS5002C gas turbine, such as LP shaft Рlocked trip, high exhaust temp spread trip, ratchet solenoid valve trouble and so on. The relevant and handling Рmethods for solving the problems mentioned above were put forward.Р Key words: gas turbine; starting failure; Mark VI; analysis and treatmentР- 48 -

收藏

分享

举报
下载此文档