nconformities or potential nonconformity, corrective, preventive measures, make quality system to enter benign loop. 结束语 Conclusion 本文就建筑工程项目施工阶段的质量控制问题进行分析和研究。在实际的施工过程中, 质量控制是一个很复杂的过程,我们应该在实践中不断的去探索和完善。 This paper analyze and Research on the problems of quality control in construction stage of construction project. In the actual construction process, quality control isa plex process, we should constantly in practice to explore and improve the. 参考文献: Reference. [1] 黄翠连. 分析建筑施工管理中存在的问题[J]. 建材发展导向, 2011 ,(2). [1] Huang Cuilian. Analysis of the existing problems in the management of [J]. construction building materials development, 2011, (2 ). [2] 胡佐立. 浅析建筑施工过程中的质量问题[J]. 西部大开发, 2010 ,(7). [2] Hu Zuoli. Quality problems on the course of construction of [J]. western big development, 2010, (7 ).