650~80%带状清理带宽1.5m0.6~0.99.0~13.5团块状清理1.0m×1.0m5.3~7.2全面清理1.4~2.023.1~35.7>80%带状清理带宽1.5m0.9~1.315.0~22.6团块状清理1.0m×1.0m8.9~10.45.整地技术经济指标表防护林造林整地,技术经济指标应符合本标准表3.1.5的规定。表3.1.5造林整地技术经济指标表项目规格单位人工整地机械整地砂土壤土粘土石质土盐渍土带状窄带(1m)工日.台班/hm211~1914~2116~3019~3314~21中带(1.5m)19~3420~3625~4530~5620~361.1~1.9宽带(2m)23~4326~5034~6337~6826~501.4~2.6穴状30×30×30(cm)工日/hm212~2415~3019~3727~4915~300.3~0.640×40×30(cm)15~2817~3523~4230~5617~350.5~1.150×50×40(cm)31~6036~7446~8962~11436~741.1~2.360×60×50(cm)56~10965~13285~156111~20865~1322.0~4.180×60×40(cm)58~11469~13993~167123~22769~1392.1~4.480×80×60(cm)111~227139~278185~313222~417139~2784.3~9.3100×60×40(cm)69~13985~167111~192139~25085~1672.6~5.4块状80×80(cm)工日/hm215~2819~3624~4429~5019~36全面整地工日/hm214~2916~3218~3621~4116~32鱼鳞坑60×60×40(cm)工日.台班/h53~10469~12585~1671.8~3.7