30米小箱梁吊方案

上传者:随心@流浪 |  格式:doc  |  页数:12 |  大小:288KB

文档介绍
保证措施1.现场布置1)、施工现场布局合理,材料堆放整齐。2)、施工现场道路畅通、场地平整、无积水。3)、施工区域或危险区域应有醒目的警示标志,并采取安全保护措施。2.排水要求场地内应设置连续、畅通的排水设施。3.临时设施的设置要求应布置合理,既要注意安全又要便于安全生产。施工区域与非施工区域应有一定的隔离设施。150吨汽车起重机性能表(一)主臂360°75%起重性能工作半径(m)吊臂长度(m)13.917.721.325.028.732.336.039.643.152.83.01403.6126.965.264.44.0122.965.163.74.5108.965.163.956.55.099.865.161.455.46.080.365.056.651.746.640.87.068.962.053.347.243.937.833.131.58.058.757.148.144.630.034.431.930.29.049.449.244.941.235.831.929.827.227.010.042.041.941.635.733.829.527.225.424.812.029.829.829.227.724.623.321.821.317.614.021.621.621.621.621.420.419.517.416.016.016.316.316.316.316.316.315.213.718.012.612.612.612.612.612.612.612.219.09.79.79.79.79.79.710.723.06.76.76.76.76.79.126.04.64.64.64.64.66.829.03.03.03.03.04.535.01.71.71.73.038.00.50.51.841.00.9 150吨汽车起重机性能表(二)吊臂回转至后部及两侧时吊装性能