全文预览

安徽省“粮安工程”危仓老库维修改造

上传者:upcfxx |  格式:doc  |  页数:6 |  大小:0KB

加载中,请稍后...

如果超过10秒未动,请按F5键刷新本页面

加载中,请稍后...

如果超过10秒未动,请按F5键刷新本页面

加载中,请稍后...

如果超过10秒未动,请按F5键刷新本页面

文档介绍
valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured- 2 -РРРseveral group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured

收藏

分享

举报
下载此文档