tor plete, and adjusted to zero.Рl炉本体各处梯子、平台、栏杆完整,照明充足,炉本体清理干净。РBoiler body plete ladder, platform, railings, lighting is adequate, clean up the furnace body.Рl炉酸洗结束,系统恢复。РBoiler acid cleaning finished and the system recovered.Рl贮水箱水位计安装完好,调试完毕,能随时投入。РStorage tank level installation intact, debugging finished, can be used at any time.Рl炉水取样、加药、充氮系统安装完好。验收合格。РThe sampling, dosing and filling nitrogen system of boiler water installation intact and acceptance.Рl除氧、给水、减温水、事故喷水系统安装完毕,水冲洗合格。各电、气动阀门调试完毕,经检查确认合格,可投入使用。РThe system of deaerator, feed water, desuperheater water, emergency spray water installed, water flushing qualified. All electrical, pneumatic valves finish testing, confirmed by the inspection qualified, can be put into use.Рl电动给水泵具备投入条件。РMDBFP ready condition.Рl炉本体各人孔门、检查孔门完备,并封闭。