························0.96m/s7、托轮间距····································7m8、尾轮张紧行程································7m9、最大输送效率································431人次/h10、张紧重锤···································400kg11、牵引钢丝绳·······6*36φ20(1670Mpa)······950m12、重锤张紧钢丝绳···6×19φ12.5mm············60m13、防爆电机功率·······380/660V···············37KW14、钢丝绳离巷道垂直高度距离···················2000mm15、钢丝绳最大牵引力····························14.8KN16、钢丝绳破断力································270KN第二章要紧工程量2.1、机械部分安装2.1.1驱动装置安装···············部件···············1套2.1.2迂回轮装置安装·············部件···············1套2.1.3张紧装置安装···············部件···············1套2.1.4配重装置安装···············部件···············1套2.1.5可调式托轮吊架安装·····························52件2.1.6托轮横梁安装···································72根2.1.7固定式托轮吊架安装·····························