yobeytheregulationsofelectricpowersafetywork,mander.7.9.涉及带电设备的检查与试验,要防止感应电的伤害。Checkandtesttheenergizedequipment,preventtheinfluenceelectricitydamage7.10.试验期间应派人巡视各区域的设备,特别是变压器区域及发电机出线区域,发现异常情况及时报告。Duringtest,strengthensystempatrolling,especiallythetransformerareaandgeneratoroutletarea,reportanyabnormalcircs.7.11.变压器区域、发电机及出线区域、励磁变区域的消防设施应完善,具备投入使用的条件。ThefirefightingmeasuresshouldbeavailableneartheG-Tandexciterarea.pany2009-09燃气轮发电机组运行记录表GasTurbine-GeneratorTrial-runRecord2009年year月month日date时间TimeTNH(RPM)有功(MW)Activepower(MW)CTIF1A(℃)BB1(mm/S)BB2(mm/S)BB4(mm/s)BB5(mm/S)BB10(mm/S)BB11(mm/S)BB12(mm/S)LTTH1(℃)LTB1D(℃)LTBT1D(℃)LTB2D(℃)LTG1D(℃)LTG2D(℃)BTRGB1(℃)BTRGB2(℃)BTRGP1(℃)BTRGP2(℃)TTXM(℃)TTXSP1(℃)滑油母管压力(MPa)Lubeoilheaderpressure滑油压差(bar)Lubeoildifferentialpress压力油压力(Mpa)Pressureoilpress.