年产5000吨味精设备配置清单

上传者:业精于勤 |  格式:doc  |  页数:9 |  大小:0KB

文档介绍
size data of the plant to the seller. It should include location, length, width of the plant, the height of the house, and the width and height of the door, and then the seller could design the floor chart, and prepare the connection pipes. Р3.卖方工程师在买方服务期间的食宿、保险、往返交通费等均由卖方负责并承担。РThe buyer takes charge of the round-trip air fare, insurance and modation of the technical engineers from seller. Р4.卖方工程师到达买方现场前,买方必须保证水源、电源、气源已经正常运行,并安排足够人员帮助卖方工程师,提前备置好必要的施工工具,诸如焊机、切割机、扳手等,以便于工作的顺利开展。РThe buyer must guarantee the useful of water, electricity and gas before the seller's engineer arriving at factory, and the buyer should arrange enough people to help engineer and supply necessary construction tools, such as welding machine, cutting machine and wrench and so on. РZhongde Equipment Co,.Ltd. Shandong