0211.03.05.0222212212222222111????????????????????????????????????????????中间共有15个缩放组合,故:h=15×(0.00199+0.00447)=0.0969m②侧边部分:10mggvFFhmggvvh0027.0226.02045.1675.01.012100117.02147.026.05.02222'12'2'12'2222'22'11'1????????????????????????????????????????????侧边有6个缩放组合,故:h’=6×(0.00117+0.0027)=0.02322m③进口及转弯损失:共一个进口、3个上转弯和3个下转弯。上转弯处水深0.879m,下转弯处水深0.854m。进口流速:v3取0.3m/s上转弯流速:smv/134.05.1879.036005.6374????下转弯流速:smv/138.05.1854.036005.6375????每格进口及转弯损失mgggh027.02138.0332134.08.1323.03222"?????????④总损失:每格总损失:mhhhh1266.0027.00027.00969.0"'????????第一絮凝区总损失:mhH2532.01266.0221??????第一絮凝区停留时间:min28.560177.0335.15.006.048.55.35.121??????????T第一絮凝区平均G1值:1411113.8828.510029.1602532.0100060?????????sTHG??3.4第二絮凝区(1)第二絮凝区采用同波折板布置:折板距离采用b1=0.79m侧边峰距b2=0.771m侧边谷距b3=1.125m实际流速sLQv/m15.05.179.036005.637b011?????