.6m,每超过1m(不足1m者,按1m计),按每10m3混凝土工程量增加138.13元;8.河北定额中,实砌内墙及抹灰中已包括3.6m脚手架的费用,不另行计算;若超过3.6m,则应计算,按相应砌筑单排脚手架基价乘以0.7系数计算,独立柱脚手架按相应高度单排脚手架计算;9.屋面工程中垫层及水泥砂浆找平层按楼地面工程相应项目计算;10.楼地面工程垫层项目用于基础垫层时,人工及机械乘以系数1.2。表5-16材料汇总及价差调整表单位工程名称:单层实习车间序号材料名称规格单位数量预算价(元)市场价(元)单价差(元)合价(元)备注综合用工工日628.01水泥325#t8.43205.00230.0025.00210.75425#t12.70254.00300.0046.00584.202中砂t74.5021.8845.0023.121722.443碎石t34.5030.4138.007.59261.864白石子t1.43120.00130.0010.0014.305生石灰t8.7989.76115.0025.24221.867红(青)砖千块41.87116.00150.0034.001423.588水m385.590.551.000.4538.529钢筋ф6t0.2972400.002400.0000包括加固筋ф8t0.2092400.002400.0000ф10t0.0092400.002400.0000Ф12t0.6072400.002450.0050.0030.35Ф18t0.1732400.002450.0050.008.65Ф20t0.0342400.002450.0050.001.70Ф22t0.0392400.002450.0050.001.9510空腹钢门m216.0102.51110.007.49119.8411空腹钢窗m221.079.5680.000.449.24