712.30(1)组织措施费23634926.661.584、其他项目费00.000.005、规费(含工伤保险费)26477629.871.776、税金51646858.263.45总造价149550461686.98100.00三、人材机耗用量分析序号名称单位数量耗用量(每平米)金额(元)占总价比例(%)1、人工费319004921.33(1)一类工日00.00000.00(2)二类工日210762.377168608011.27(3)三类工日172871.950150396910.062、机械费元4627743.093、材料费元1074242771.83(1)螺纹钢吨3030.0347319794.89(2)圆钢吨370.004965270.65(3)结构商品砼m332600.36811816607.90(4)水泥吨2300.026875630.59(5)黄砂吨7410.084422310.28(6)碎石吨20060.2261464580.98(7)蒸压砂加气砼砌块m312280.1393595712.40(8)高分子防水卷材m214300.161643760.43(9)断热铝合金窗m218760.2129502066.35(10)木质防火门扇1050.012627920.42(11)外墙花岗岩m259760.67412166038.14(12)外墙真石漆涂料m220560.2321645401.10(13)内墙白色涂料m245310.511906750.61(14)电线m483195.451907920.61(15)电缆m59480.6711933031.29(16)配电箱元2357751.58(17)土建其它材料费元288415719.29(18)电气其它材料费元12092028.09(19)给排水材料费元6867144.59(20)消防材料费元2473031.65