现场可不备)Р3)Test equipment for transformer oil on the site (there is no need for this equipment if the samples can be taken to the lab) Р4)氧气含量表:充氮运输产品测油箱内的氧气含量Р4)O2 content meter: measure the O2 content in the product transported with N2Р5.2 人员准备Р5.2 Personnel preparationР5.2.1 安装工程开工之前,应组织足够的人力。其中包括通知制造厂来人指导安装和协助单位来人协助安装(适当考虑旅程和天气因素)。Р5.2.1 Enough persons should anized before the installation, including specialists from the manufacturer and pany to guide and assist the work.Р5.2.2 对参加安装的人员应合理分工,并安排合适人员负责以下任务:Р5.2.2 The installation work should be divided among the workers properly, some persons should be arranged to charge the following tasks:Р1)工程领导人?Р1)Project leaderР2)现场总指挥Рmander on the siteР3)制造厂代表Р3)Manufactory representativesР4)安装技术负责人Р4)Persons responsible for installation technique