ary capability study (Ppk)РDescription: PQA Engineers checks that ISIR results are pliance with the Validation plan and the VRF, including preliminary capability study Ppk, performed on SPPC (SQA 2104 Appendix 9) РRank 15 Р任务名:供应商发送内部ISIR,包括初始过程能力研究(Ppk)Р表述:PQA工程师检查ISIR结果,要与验证计划及VRF一致,包括初步能力研究Ppk,在SPPC上的表现.(SQA2104 附录9)Р15. Task: Supplier sends its Launch Readiness AuditРDescription: Supplier attached the FDPR readiness matrix (SQA 2104 Appendix 6) showing that it plies with the requirements in order to schedule the Full Day Production Run performed by VALEO Team. SQA Manager decides whetether he assignes the PQA Auditor to perform the process audit at Supplier SiteРRank: 16Р任务名:供应商发送生产准备审核报告Р表述:供应商附上FDPR准备基型(SQA2104附录6)表明它严格遵守要求,为了安排全日生产运行计划,由法雷奥团队履行。SQA经理决定是否指定PQA审计员在供应商所在点来履行过程审核。Р等级:16