ssor, Purifiers for F.O. and L.O , Bilge system, Bilge oily water separator, Sewage treatment plant, F.O. supply system, Fire alarm system in E/R, Extending alarm system etc.Р其他机电设备:主空气压缩机;燃油、滑油、分油机;舱底水系统;舱底油水Р分离器;污水处理装置;燃油供给系统;火警系统;轮机员呼叫系统;延伸报警系统等。РZ type main propulsion equipment; main propulsion motor; main propulsion transformer; AZ drive and for AZ drive auxiliaries(ABB cooling system, pre-changer power box; pump; and FB control box etc.)РZ型主推进器;主推进电机;主推进器变压器;变频器及为变频器服务的重要泵和控制箱(板式冷却器及ABB冷却系统,预充电箱等)Р3.4 Test condition Р 测试条件Р3.4.1 Checking alarm points of E/R monitor alarm system have been test and the inspect result is satisfied; Confirming the self-check function of alarm system to be normal and the alarm points to be unlocked, every alarm point running properly;Correcting every faul