5 1.8× 2.4 2 2.65 C-1 0.40 2.1 × 2.1 8 14.11 C-2 0.40 1.8 × 1.5 6 6.48 C-3 0.40 1.4 × 1.5 24 20.16 C-4 0.40 2.0 × 1.52 2.4 C-5 0.40 1.2× 1.5 6 4.32 2~5 M- 6 0.35 1.8× 2.1 2 2.65 66.96 M-3 0.15 0.9 × 2.1 20 5.67 M-4 0.15 1.5× 2.1 2 0.95 M-5 0.15 1.2 × 2.1 2 0. 76 C-1 0.40 2.1 × 2.1 1221 .16 C-2 0.40 1.8 × 1.5 6 6.48 C-3 0.40 1.4 × 1.5 24 20.16 C-4 0.40 2.0 × 1.54 4.8 C-5 0.40 1.2× 1.5 6 4.32 3.6.5 重力荷载代表值计算顶层重力荷载代表值=屋面恒载+0.5 ×屋面雪载+纵、横梁自重+半层柱自重+半层墙体自重[4]顶层:屋面恒载 Q 1 =4331.53 kN 屋面雪载 Q 2 =350.12 kN 梁自重 Q 3 =2285.53 kN 柱自重 Q 4 =1924.56 kN 墙体自重 Q 5 =2115.65 kN G 5′=4331.53+0.5 × 350.12+2285.53+0.5 × 1924.56+0.5 × 2115.65=8812.23 kN 门窗自重 Q 6 =66.96 kN 女儿墙自重 Q 7 =(65.4 +6×2+ 3)×2×1.2 ×2.04= 393.64 kN G 5 =8812.23+66.96 + 365.73=9272.83 kN 其余层重力荷载代表值= 楼面恒载+0. 5× 楼面活载+ 纵、横梁自重+ 楼面上下各半层柱自重+楼面上下各半层墙体自重