全文预览

《SH-T3903--2016监理表格》.doc

上传者:学习一点 |  格式:doc  |  页数:35 |  大小:0KB

文档介绍
components/ equipment for the works on its quantity is listed below ( see the attachments ) .Now, we submit the quality documents and our self inspection results, The proposed locations for use as follow s:, Please review it. 附件 Attached : 1 数量清单 Quantity List ; 2 质量证明文件 Quality Documents ; 3 自检结果 Self Inspection Results 。承包单位(章) C ontractor ( Chop ) 项目经理 Project manager 日期 Date 审查意见 ments : 经检查上述工程材料/ 构配件/ 设备, 符合/ 不符合设计文件和规范的要求, 准许/ 不准许进场, 同意/ 不同意使用于拟定部位。 After the inspection, the above materials / components/ equipment , meet/ do not meet the requirements of the design documents and specifications. site mobilization is allowed/ site mobilization is not allowed, use for the proposed locations is allowed / not allowed. 项目监理机构 CS/CMC 总/ 专业监理工程师 Chief/discipline supervision engineer 日期 Date

收藏

分享

举报
下载此文档